207MWp Photovoltaic Plant at Ptolemaida
RENEWABLE ENERGY

207MWp Photovoltaic Plant at Ptolemaida

A&G Powering Construction undertook the construction of a Photovoltaic Plant of a capacity of 207MWp. A&G carried out the mechanical works with a single-axis tracker (Tracker), with a power of 25MWp, and the electrical works with a power of 107MWp in a Lignite mine of PPC in Ptolemaida. The project was appointed by HELPE and Juwi Hellas was the contractor.