Fibre Optic Network Installation in Yliki
INFRASTRUCTURE

Fibre Optic Network Installation in Yliki

A&G Powering Construction undertook fibre optic interconnection works along a 9-kilometre section of the PATHE motorway in the Yliki area, contributing to the development of the motorway’s telecommunications infrastructure.

A&G Powering Construction undertook fibre optic interconnection works along a 9-kilometre section of the PATHE motorway in the Yliki area, contributing to the development of the motorway’s telecommunications infrastructure.

The scope of works included fibre optic splicing and the necessary measurements using an Optical Time-Domain Reflectometer (OTDR) to verify the quality of the connections and the proper operation of the installation.

The project required precision at every stage, from fibre interconnection to final testing, to support reliable data transmission across the network.

The Power Behind the Projects
Shaping Tomorrow.

A&G Powering Construction contributes to the development of major infrastructure projects, undertaking complex electrical engineering and construction works across Greece and international markets.